Stock Planning

Lead Time Calculator

Enter the days each stage takes, from raising the order to putting the goods on the shelf. You get the total lead time and the demand it has to cover.

Your numbers

The result updates as you type.

Result

Total lead time—
In weeks
—
Units used during lead time
—

What is lead time?

Lead time is the total time between deciding to order and having the goods ready to sell or use. It includes the time to raise and approve the order, the time the supplier needs to make or pick it, transit, and your own time to receive and put it away.

Formulas

Worked example

Processing takes 2 days, the supplier needs 10 and shipping and receiving take 5, so the lead time is 17 days (2.4 weeks). At 30 units a day you will use 510 units in that time.

How to use the lead time calculator

  1. Enter your figures: order processing, production or supplier time and shipping and receiving. Average daily usage is optional and counts as zero when left empty.
  2. Read the result. It updates as you type, so there is no button to press.
  3. Try other numbers to compare scenarios. Reset brings back the example values.

Getting it right

Frequently asked questions

How do you calculate lead time?

Add the days taken by each stage between placing an order and the stock being available: order processing, supplier production, transit and receiving.

What is the difference between lead time and cycle time?

Lead time is measured from the customer’s or buyer’s side, from order to delivery. Cycle time is measured inside production, from starting work on a unit to finishing it.

Why does lead time matter for inventory?

It sets how early you must reorder. Double the lead time and you need twice the stock on hand at the moment you place the order.