Construction

CFT Calculator

Enter length, width and height in whatever unit you measured, and get the volume in cubic feet and cubic metres — with the cost if you know the rate.

The measurement

The result updates as you type.

Result

Volume—
In cubic metres (CBM)
—
One piece
—
Total cost at that rate
—
Truck loads (100 cft each)
—

What CFT means

CFT is cubic feet — the volume of a box one foot on each side. Timber, sand, stone chips and earthwork are all bought and billed in cft in Bangladesh and India, so being able to turn three measurements into a volume is a daily job on site.

Formula

Worked example

A pile of sand 10 ft long, 6 ft wide and 4 ft deep is 240 cft, or 6.80 cubic metres — a little over two 100 cft truck loads. At 60 per cft, that sand costs 14,400.

How to use the CFT calculator

  1. Measure all three sides and pick the unit you used — mixing feet and inches is the usual source of mistakes.
  2. Set the number of pieces if you are costing several identical planks or blocks.
  3. Add the rate per cft to get the bill alongside the volume.

Notes for site work

Frequently asked questions

How do I calculate CFT?

Multiply length by width by height, with every measurement in feet. 10 × 6 × 4 feet is 240 cubic feet.

How many cft are in one cubic metre?

35.3147 cubic feet. Going the other way, one cubic foot is 0.0283 cubic metres.

How many cft is one truck of sand?

It depends on the truck. A common small tipper carries about 100 cft, and larger ones 200 to 300 cft. The calculator shows how many 100 cft loads your volume works out to.